• +90 212 702 00 00
  • +90 532 281 01 42
  • I info@muayene.co
trarbgzh-TWenfrkadefaru

Electrical Insulation (General) Standards

By complying with the methods required by the tests required, we make the necessary arrangements and carry out the certification processes in the following standards.

 

TS EN 50124-1 / A1 Railway applications - Insulation coordination - chapter 1: Basic requirements - Insulation intervals and surface leakage path lengths for all electrical and electronic equipment

TS EN 50124-1 / A2 Railway applications - Insulation coordination - Part 1: Basic requirements - Insulation intervals and surface leakage path lengths for all electrical and electronic equipment

Electrical safety in low voltage distribution systems - up to 61557 v aa and 1 v - Equipment for testing, measuring or monitoring protective devices - Part 1000: General features

TS EN 61557-2 Electrical safety in low-voltage distribution systems - up to 1000 v aa and 1500 v da - Equipment for testing, measuring or monitoring protective devices - Part 2: Insulation resistance

TS EN 61557-3 Electrical safety in low-voltage distribution systems - up to 1000 v aa and 1500 v da - Equipment for testing, measuring or monitoring protective devices - Part 3: Loop impedance

TS EN 61557-4 Electrical safety in low voltage distribution systems - up to 1000 v aa and 1500 v da - Equipment for testing, measuring or monitoring protective devices - Part 4: Resistance of earth connection and equipotential bonding

TS EN 61557-5 Electrical safety in low voltage distribution systems - up to 1000 v aa and 1500 v da - Equipment for testing, measuring or monitoring protective devices - Part 5: Resistance to earth

TS EN 61557-6 Electrical safety in low-voltage distribution systems - up to 1000 v aa and 1500 v da - Equipment for testing, measuring or monitoring protective devices - Part 6: Efficiency of residual current devices in Tt, tn and it systems

TS EN 61557-7 Electrical safety in low voltage distribution systems - up to 1000 v aa and 1500 v da - Equipment for testing, measuring or monitoring protective devices - Part 7: Phase sequence

TS EN 50124-1 / AC Railway applications - Insulation coordination - Part 1: Basic rules - Insulation intervals and surface leakage path lengths for all electrical and electronic equipment

TS EN 50124-1 / AC: 2007 Railway applications - Insulation coordination - Part 1: Basic rules - Insulation intervals and surface leakage path lengths for all electrical and electronic equipment

TS EN 61557-13 Electrical safety in low-voltage distribution systems - up to 1000 v aa and 1500 v d.a - Testing, measuring or monitoring of protective devices - Part 13: Hand-held or actuated for leakage current measurements in electrical distribution systems current clamps and sensors

TS EN 61557-5 Electrical safety in low voltage distribution systems - up to 1 kv 'aa and 1,5 kv' - Equipment for testing, measuring or monitoring protective devices - Part 5: Resistance to earth

TS EN 61557-1 Electrical safety in low voltage distribution systems - Up to 1 kv aa and 1,5 kv d.a - Equipment for testing, measuring or monitoring protective devices - Part 10: Testing, measuring and monitoring protective devices

TS EN 61557-12 Electrical safety in low voltage distribution systems - up to 1 kv aa and 1,5 kv d.a - Equipment for testing, measuring or monitoring protective devices - Part 10: Performance measurement and monitoring devices

TS EN 61557-15 Electrical safety in low-voltage distribution systems up to 1000 V aa and 1500 V - Equipment for testing, measuring and monitoring protection measures - Part 15: Functional safety rules for insulation monitoring elements in IT systems and locating insulation defect in IT systems Hardware for

TS EN 61936-1 Power plants exceeding 1 kv a.a - Part 1: General requirements

TS EN 61936-1: Power plants exceeding 2010 / A1 1 kv a.a - Part 1: General requirements

tst EN 61936-1 Power plants exceeding 1 kv a.a - Part 1: General requirements

TS EN 61936-1: Power plants exceeding 2011 / tstA1 1 kv a.a - Section 1: General requirements

TS EN 61936-1: Power plants exceeding 2011 / tstAC 1 kv a.a - Section 1: General requirements

TS EN 50124-1 / AC: 2007 Railway applications - Insulation coordination - Part 1: Basic rules - Insulation intervals and surface leakage path lengths for all electrical and electronic equipment

Electrical safety of low voltage distribution systems up to 61557 V aa and 16 V - Equipment for testing, measuring or monitoring protection measures - Part 1000: Equipment for efficiency testing of electrical and / or medical electrical equipment protection measures

TS EN 61557-8 Electrical safety in low voltage distribution systems - up to 1 kv aa and 1,5 kv d.a - Test equipment for testing, measuring or monitoring protective devices - Part 8: Insulation control devices for IT systems

TS EN 61557-8 / AC Electrical safety in low voltage distribution systems - up to 1 kv aa and 1,5 kv d.a - Test equipment for testing, measuring or monitoring protective devices - Part 8: Insulation control devices for IT systems

TS EN 60071-2 Insulation coordination - Part 2: Application guide

TS EN 50124-1 Railway applications - Insulation coordination - Part 1: Basic rules - Insulation intervals and surface leakage paths for all electrical and electronic equipment

TS EN 50124-2 Railway applications - Insulation coordination - Part 2: Overvoltages and related protection

TS EN 50209 Insulation test of rods and coils of high-voltage machines